High Efficiency Desander for Oil Drilling Mud Solid Control System

Product Details
Customization: Available
After-sales Service: Online After-Sales Service
Warranty: 1 Years
Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Fast Delivery
The supplier can deliver the goods within 15 days
Quality Assurance
The supplier provides quality assurance
to see all verified strength labels (19)
  • High Efficiency Desander for Oil Drilling Mud Solid Control System
  • High Efficiency Desander for Oil Drilling Mud Solid Control System
  • High Efficiency Desander for Oil Drilling Mud Solid Control System
  • High Efficiency Desander for Oil Drilling Mud Solid Control System
  • High Efficiency Desander for Oil Drilling Mud Solid Control System
  • High Efficiency Desander for Oil Drilling Mud Solid Control System
Find Similar Products

Basic Info.

Certification
CE, ISO 9001:2000
Power Source
Electric
Operation Pressure
Atmospheric Pressure
Material
Cast Aluminum
Type
Mud Tank
Application
Slurry Separation
Features
Efficient,Compact
Video Outgoing-Inspection
Provided
Machinery Test Report
Provided
Specification
Standard Specifications or Customized
Trademark
KINGWELL
Origin
China

Product Description

High Efficiency Desander for Oil Drilling Mud Solid Control System
High Efficiency Desander for Oil Drilling Mud Solid Control SystemHigh Efficiency Desander for Oil Drilling Mud Solid Control System
KINGWELL can manufacture all equipment for treating the driling fuid and mud tanks, and combine them into a complete and highly efficient recycing system, in accordance with the requirements of rigs with capacities from 250 HP to 3000 HP. As a manufacturer of driling mud solids control equipment with APl and IS0 certificates, KINGWELL is also certified by Europe CEfor export to developed countries.

The solids control equipment involved in mud system as follows:

  • Shale Shaker for first phase solids control, to remove 100 microns solid particles;
  • Desander cyclones for second phase solids control, to remove cuttings 40 microns solid particles
  • Desilter cyclones for third phase solids control, to remove cuttings 20 microns solid particles
  • Decanter Centrifuge for last phase solids control, to remove 2-7 microns fine solids, we call it mud weight cutting process.

 

Oil drilling Mud System normally including following mud tanks depends on the configuration:

  • Shaker Tank (It normally equipped with 2 or 3 units shaker, desander, desilter)
  • Centrifuge Tank (It normally equipped with 2 or 3 units high speed and low speed decanter centrifuge)
  • Mixing Tank (It normally equipped with several sets mud agitators, mud hoppers and jet mud mixers)
  • Storage Tank (It normally equipped with mud agitators, and connect to mud pump)
High Efficiency Desander for Oil Drilling Mud Solid Control System
Product Name
Mud Tank
Material
Steel
Dimension
8510*2701*2305mm
Weight
9.6tons
MOQ
1set
Type
Solid Control System
High Efficiency Desander for Oil Drilling Mud Solid Control System
High Efficiency Desander for Oil Drilling Mud Solid Control System
High Efficiency Desander for Oil Drilling Mud Solid Control System

High Efficiency Desander for Oil Drilling Mud Solid Control SystemHigh Efficiency Desander for Oil Drilling Mud Solid Control System
High Efficiency Desander for Oil Drilling Mud Solid Control SystemHigh Efficiency Desander for Oil Drilling Mud Solid Control SystemHigh Efficiency Desander for Oil Drilling Mud Solid Control System

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier